Selected work led by our principals across civic, institutional, transportation, aviation and marine construction in British Columbia.
The projects below were delivered under Ventana (Special Projects) Corporation and Graham Construction, where our leadership was based before founding PlanX. They are presented as individual professional experience. PlanX Construction Corporation did not hold these contracts.
The people who ran these projects are the people who will run yours — that’s why PlanX exists.
Canada Place Cruise Elevator Retrofit
Vancouver, BC · Marine — Cruise Terminal
Two new elevators serving three levels inside an operating cruise terminal, including a pit suspended over water beneath the pier — delivered around seasonal terminal windows and long-term hoarding.
DELIVERY Pre-Construction & Construction Services
PERIOD Oct 2025 – May 2026
SIZE 2 elevators / 3-storey rise
Scope delivered to May 2026; the contract continues.
Delivered under Ventana (Special Projects) Corporation
Traditional Learning Academy — Seismic Upgrade
Coquitlam, BC · Institutional — Education
Full seismic upgrade of a school that stayed open throughout — structural steel and seismic bracing, masonry reinforcement with fibre-reinforced polymer strengthening, enlarged foundations and roof reinforcement, with students and staff in the building.
DELIVERY Pre-Construction & Construction Services
PERIOD Feb 2025 – Mar 2026
SIZE 21,000 sq. ft.
Delivered under Ventana (Special Projects) Corporation
Christine Sinclair Community Centre — Tenant Improvement
Burnaby, BC · Municipal — Community Facility
Conversion of 12,000 sq. ft. of Level 1 into lounges, activity rooms, offices and meeting rooms, including sports flooring, demountable partitions and full mechanical and electrical upgrades — in a recreation centre that never closed.
DELIVERY Pre-Construction & Construction Services
PERIOD Mar 2024 – Nov 2024
SIZE 12,000 sq. ft.
Delivered under Ventana (Special Projects) Corporation
North Delta Track & Field House
Delta, BC · Municipal — Civic Facility
A two-level civic field house built from repurposed steel shipping containers combined with traditional framing — modular construction applied to public infrastructure, with material reuse supporting municipal sustainable-design objectives.
DELIVERY Pre-Construction & Construction Services
PERIOD Dec 2024 – Mar 2026
SIZE 3,445 sq. ft.
Delivered under Ventana (Special Projects) Corporation
Systems Implementation Project
Metro Vancouver, BC · Transportation — Active Transit
Installation and commissioning of roughly 2,800 passenger information, public address and CCTV devices across 20 active SkyTrain stations. A mounting-design change for the equipment enclosures, developed during rollout, saved $1.2M against the original design.
DELIVERY Pre-Construction & Construction Services
PERIOD Sep 2018 – Mar 2021
SIZE 20 active SkyTrain stations
Delivered under Graham Construction
Link Densification Project
Richmond, BC · Aviation — Occupied Airport Office
Demolition and reconfiguration of operational offices inside an active airport building — glass partitions, workstations, meeting booths and focus rooms, with electrical, data and HVAC reworked around them.
DELIVERY Construction Management
PERIOD Apr 2024 – Dec 2024
SIZE 30,000 sq. ft.
Delivered under Ventana (Special Projects) Corporation
University Campus Office Renovation
Vancouver, BC · Institutional — Occupied Office
Modernization of an occupied campus office, including removal of a section of the Level 3 slab to form a new interconnecting staircase between Levels 2 and 3 — phased around staff in place.
DELIVERY Pre-Construction & Construction Services
PERIOD Aug 2023 – Mar 2024
SIZE 12,000 sq. ft.
Delivered under Ventana (Special Projects) Corporation
West 4th Midblock
Kitsilano, Vancouver, BC · Mixed-Use — New Build
New two-storey steel commercial building with retail, restaurant, bank and office space — deep excavation, contaminated-soil removal, micropiling, soil anchors and underpinning of neighbouring properties on a tight urban site.
DELIVERY Pre-Construction & Construction Services
PERIOD Mar 2025 – May 2026
SIZE 7,300 sq. ft.
Scope delivered to May 2026; the contract continues.
Delivered under Ventana (Special Projects) Corporation